Chesterfield NJ Old York Village Homes: Growth and What's Next

Chesterfield, a farm township in Burlington County, put more than 1,100 homes on closely spaced village streets in one place and kept open fields almost everywhere else, and it did so by design. The plan concentrated development in a village that is nearing completion.

That matters if you're comparing Chesterfield with other towns. The township has published a list of new homes it projects through 2035, and Old York Village grew out of a master plan almost 30 years ago.

Every Market-Rate Home in Old York Village Started as a Farm's Development Right

In 1998, Chesterfield became the first municipality in New Jersey to enact a township-wide transfer of development rights program, according to the township's own 2025 summary. The idea came from a 1997 master plan. It recommended a voluntary credit system to keep large blocks of farmland together, protect landowners' equity, and steer growth to one place with sewer service.

The program links development credits in the agricultural "sending" area with building in the "receiving" area, which became Old York Village. The township code bases each farm's credits on its soils.

A New Jersey State Agriculture Development Committee case study reports a public auction in July 2004 where 50 credits sold for $50,000 each. That price is more than 20 years old. The township said in 2025 that credit values have "appreciated substantially" since the program began.

So in Old York Village, each market-rate lot came with the cost of a farm's development right. A home there is part of the reason the farmland around it stays open. Burlington County reported in June 2025 that about 90% of Chesterfield's eligible farmland had been preserved through county and state easement purchases and the credit program.

The Township Concentrated Growth in Its Plan

The plan concentrated growth in a receiving area on purpose. The 1997 master plan expected the 569-acre receiving area to hold as many as 1,220 development credits and up to 1,700 housing units. In 2025 the township wrote, "It is implicit in a TDR program that growth is finite."

According to the township's amended Housing Element and Fair Share Plan, which the Township Committee endorsed in February 2026, more than 1,100 credits have been enrolled and 1,133 homes have been built in the receiving area over 24 years. The plan says Old York Village "is nearing completion." The plan also says almost all development in Chesterfield since the 1990s has happened inside the receiving area.

The plan notes that growth here does not follow a straight line. New Jersey Department of Community Affairs data show 312 certificates of occupancy issued in Chesterfield from 2013 to 2023. The township says that number doesn't predict growth from 2025 through 2035, because growth depends on how much land is left in the receiving area and whether credits are available.

The Short List of New Homes Through 2035

The township projects 181 new homes from 2025 through 2035. Here is how its plan lists them:

Project Location Home type Status Units Projected completion
118NP Receiving area Single-family detached and attached Approved 12 2027
Bentley Farm Receiving area Single-family detached Approved 23 2027
Ottavi Property Receiving area Single-family detached Proposed 12 2028
Crosswicks Firehouse Crosswicks Multifamily Proposed 4 2027
Mincemeat Factory Crosswicks Single-family Proposed 6 2028
Liedtka Property Receiving area Single-family detached and attached Zoned 124 Unknown

Some of these projects have moved since that table was written. Bentley Farm Development, LLC has an approved subdivision for 23 single-family homes. The approval includes a $360,000 contribution to the township's affordable housing trust fund in place of two on-site affordable units. The Township Committee certified its developer-agreement resolution on March 12, 2026.

In Crosswicks, Chesterfield adopted the Hamilton Uniform Company/Mincemeat Factory Redevelopment Plan in July 2026, effective July 24. The ordinance calls for restoring the site's original blacksmith shop for a small neighborhood commercial use. The rest of the lot could hold up to five detached homes, or three detached and four attached homes, built to the design guidelines for Crosswicks Village. That option allows one more home than the six the township's table counts. Treat the 181 figure as a projection, not a hard ceiling. The plan itself leaves out a proposed 100% affordable project of up to 25 units and a proposed density change on the Liedtka tract.

The Biggest Remaining Site Depends on Farmland Credits

The Liedtka property has been part of the receiving area since the program began. It's a 61-acre site on the north side of Bordentown Crosswicks Road, and a tributary to Crosswicks Creek, wetlands and flood hazard areas limit how much of it can be built on. The plan discusses perimeter lots, village lots, townhouse lots and affordable units for the site. In February 2026 planning board discussion, Timberbridge Management was described as a developer with an agreement on the tract.

The plan says a developer will need about 55 credits to build the tract as intended. The township says it will help credit holders sell to the developer privately, and it will work with Burlington County to hold a credit auction if needed. The plan adds, "it is anticipated that it will be necessary."

The plan also proposes raising the affordable set-aside on remaining receiving-area sites from 6% to 10% and lowering the credits required for market-rate homes. A detached perimeter lot would drop from 1 credit to 0.6, and a townhouse lot from 0.75 to 0.45. These are proposals in the plan. If they take effect, each market-rate home on the last large site would need fewer farm credits than homes built earlier in the village did. The township's 2025 summary explains why the original rate was 6%. A higher set-aside would have lowered credit values and cut into landowners' equity, and the program depends on that equity.

What This Means for Buyers in Today's Market

Burlington County gives the closest current picture of the market around Chesterfield. NJ REALTORS publishes county reports publicly and limits municipality reports to members, so county figures are used here. In September 2026, according to the NJ REALTORS county report, the county's single-family median sale price was $455,000, up 1.1% from a year earlier. Closed sales fell 9.2% to 295. Inventory rose 7.3% to 869 homes, which equals 3.0 months of supply. Sellers still received 101.0% of list price on average, and homes took 33 days to sell.

Across the county, buyers have more homes to choose from than a year ago, and prices are roughly flat. In Chesterfield, the township's list projects new homes through 2035, and the largest project on it has no completion date and is waiting on development credits. Resale homes in the village may compete less with new construction than they would in a town that can keep adding subdivisions.

The Tax Bill Comes From More Than the Township

Taxes are one cost to check early, because they change your monthly payment more than the township's budget headlines suggest. The township's 2026 budget presentation breaks down the 2025 bill. On its average home, assessed at $394,762, the total was $14,207.48 at a combined rate of $3.599 per $100 of assessed value.

  • Township: 0.449, or 12.48%
  • Fire: 0.189, or 5.25%
  • Chesterfield school: 1.421, or 39.48%
  • Northern Burlington high school: 1.025, or 28.48%
  • County: 0.515, or 14.31%

Of that $14,207 bill, the township received $1,772. The 2026 budget proposes no increase in the municipal rate. A flat municipal rate leaves most of the bill unaddressed, because the township's share is less than an eighth of it. For any home you're considering, look up that property's actual tax bill. Don't rely on an average or on the municipal rate alone. These figures are general information and not tax or financial advice, so confirm your own numbers with your tax professional or lender.

If you're deciding between an existing home in Old York Village and waiting for one of the approved Bentley Farm or 118NP homes, I'm happy to go over timelines, recent sales and tax bills for specific properties with you. You can also start with a home valuation if you own in Chesterfield and want to know where your home fits among the remaining new construction. Nicholas Celfo is a quick message away. Let's Connect.